Haslett Road – Park Lake Road to Shaw Street Meridian Charter Township. Federal Urban STP and ICRC funding. Estimated Cost: $1,230,000. Rehabilitate the existing asphalt roadway, improve drainage, and resurface the roadway. The construction will be performed in phases. The active work zones for each phase will open to local traffic only. Through traffic will be prohibited. The project was originally scheduled for construction in 2013. MDOT and Meridian Township requested that we move the project to 2012 because of its condition and to use Haslett Road as a detour for MDOT’s 2013 Grand River Avenue – Orchard Street to Park Lake Road project. The project is scheduled for a June letting. Construction is anticipated to start in July and extend through mid-November.
May 02
Haslett Road – Park Lake Road to Shaw Street 2012
Permanent link to this article: https://www.wardcliff.org/2012-haslett-park-lake-shaw/
2 comments
At least some of Haslett Road will get some improvement! The huge puddles that form there during heavy rains have certainly been a nuisance for local drivers. Thank you for that much insight, at least!
I hope they’re going to put a cool sculpture in the middle of the traffic circle when they’re finished with the project (similar to what they’ve done at Hamilton & Marsh Roads)!